• TSX.V MXR 0.075 0.005
  • TSX VOL 50,549
  • News Releases

    2010-12-16MAX drills 9.1 metres of 1.092 g/t gold at Table Top in Nevada; additional assays pending.2010-11-24MAX assays 7.62 meters of 0.588 g/t gold, including 1.359 g/t gold over 1.52 m, in drill core at Diamond Peak gold/silver/zinc property in Nevada; MAX samples 53.5 g/t silver in outcrop.2010-10-26Max assays 5.8 g/t silver and 650 ppm Zinc in soils at Diamond Peak gold/silver/zinc property in Nevada; drilling to begin in November2010-09-27MAX to drill East Manhattan Wash, Nevada in October; additional soil samples of up to 1.27 g/t gold.2010-09-22Max completes soil sampling at Diamond Peak gold/silver/zinc property in Nevada; drill permit granted2010-09-21MAX intercepts mineralized structure at depth at Table Top gold project in Nevada; assays pending.2010-09-07MAX begins drilling to test mineralized structure at depth at Table Top gold project in Nevada2010-06-29Max to begin exploration at its Diamond Peak Gold/Zinc Property, Nevada; adds additional 96 claims2010-06-22MAX drills 27.4 meters of 0.467 g/t gold and 3 meters of 1.79 g/t gold at Table Top, Nevada; deeper drilling planned2010-05-19MAX completes drill program at Table Top gold project; Drilling commences at Diamond Peak gold/zinc project in Nevada2010-05-03MAX drills 0.823 g/t gold over 4.6 meters in silicified breccia at Table Top, Nevada; intersects potential Carlin style lamprophyre feeder system2010-04-19MAX intersects mineralized zone of silicified breccia during drilling at Table Top gold project in Nevada.2010-04-07MAX begins drilling at Table Top gold project in Nevada.2010-03-08MAX receives drill permit for Table Top gold project in Nevada2010-02-10B.C. Provincial Government Halts Mineral Exploration in Flathead Valley2010-01-18MAX stakes additional 139 claims at Table Top gold project in Nevada; Kokanee to drill MAX's Diamond Peak gold/zinc project in 2010