December 4th 2012MAX agrees to acquire 100% of Majuba Hill Silver/Copper/Gold Property in NevadaOctober 2nd 2012MAX step-out drilling extends mineralized oxide zone at DeSoto discovery, Majuba Hill, Nevada; highlights include 6.4 m @ 38.8 g/t Ag and 0.70% copper (105.1 g/t AgEq) and 7.8 m of 28 g/t Ag and 0.57% Cu (81.5 g/t AgEq)September 11th 2012MAX drills 4.6 m @58.0 g/t Ag and 7.6 m @0.80 % copperJune 14th 2012MAX completes eight drill holes at Majuba Hill silver/copper/gold project in NevadaMay 3rd 2012MAX begins Phase III drill program at Majuba Hill copper/silver/gold oxide project in Nevada.April 26th 2012MAX acquires additional 560 acres to cover the northwest extension of high grade copper/silver mineralization identified in soils at Majuba Hill, Nevada; drilling scheduled to resume in MayApril 3rd 2012MAX files drill permit for 5,000 metre Phase III drill program to test extension of high grade copper/silver/gold oxide mineralization at Majuba Hill, Nevada in May 2012.March 15th 2012MAX drills 293 m of 5.49 g/t silver, 0.10 g/t gold and 0.09% copper in porphyry-style alteration zone with significant sulfides at Majuba Hill, NevadaFebruary 22nd 2012MAX appoints Ian Smith, F.AusIMM, as DirectorFebruary 7th 2012MAX drills 29.2 m of 30.5 g/t Ag and 0.69% Cu in step-out drilling at DeSoto discovery, Majuba Hill, Nevada